top of page

Pre-Snagging Clean: Getting a New Build or Refurbishment Ready for Inspection

7 hours ago
1 min read

Snagging is the process of finding small defects before a property is handed over: chips, gaps, paint marks and unfinished details. It is hard to spot those on surfaces covered in dust. A pre-snagging clean gives the inspector a clear view.


Why clean before the inspection


Dust and residue hide scratches, uneven paint and marks on glass and fittings. Cleaning first means defects are easier to find, so they can be recorded and fixed before sign-off.


What a pre-snagging clean typically includes


  • Removing construction dust from all surfaces, windows, frames and fittings.

  • Cleaning glazing and removing labels and protective film where appropriate.

  • Cleaning kitchens and bathrooms, including appliances, sinks and tiles.

  • Floors cleaned and protected as suited to the material.

  • Communal areas, stairwells and entrances in larger developments.


Coordinate with the trades


Schedule the clean once messy work is done but before the final inspection. If contractors are still working, plan a lighter clean first and a final detail clean afterwards.


A final clean before handover


Defect fixes often create fresh dust, so many projects add a final touch-up clean before keys change hands. That way the property is presentable on handover day. If you would like a hand, get in touch with HD Cleaning & Maintenance with a few details about your property and we will talk through what is involved and give you a quote.


Learn more about our after builders cleaning services, or see everything we offer on our services page.

 
 
 

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page
Web design by Merx Marketing